CDI111 Series Production Packer for Temporary Wellbore Isolation & Staged Operations
Main Advantage & Solution
Technical Parameters
| Parameter | CDI111-114 | CDI111-148 |
| Max Outer Diameter | 114mm | 114mm |
| Nominal Diameter | 62mm | 62mm |
| Working Differential Pressure | 35MPa | 35MPa |
| Working Temperature | 120°C | 120°C |
| Tool Length | 860mm | 1200mm |
| Connecting Thread | 2 7/8 TBG | 2 7/8 TBG |
| Setting Mode | Tubing string weight | Tubing string weight |
Application Scenarios
Oil & gas well bottom temporary isolation and production layer protection
Staged operation zonal isolation matching with wrench packers
Shallow well temporary plugging and fluid replacement construction
Conventional well downhole temporary isolation for well repair operations
Our Advantages
Factory Strength
Cooperation Cases
We provide our customers with high-quality, reliable solutions backed by robust engineering and fast response capabilities.






